Natick High School Modernization Study
link to additional NHS renovation info
 
About this report
March 19, 2001

The Natick High School Modernization Study Report is provided in multiple Portable Document Format (PDF) files, which require Adobe Acrobat Reader, a free program that lets you view and print PDF files on almost any computer.  PDF format was used to provide the most accurate possible reproduction on the internet of report documents that originate from different programs with different types of content (text, graphics, photography, architectural drawings, spreadsheets).   Click here to download Adobe Acrobat Reader

  • The Executive Summary provides a brief overview of the report's findings: PDF or HTML format
  • The Cover Page represents the cover page of the actual printed report.
  • The Table of Contents is linked to each section of the report, which are provided in individual PDF documents for ease of loading.  Each section will open in a new browser window, while this page remains open in your browser.  Certain files (especially those with architectural drawings) are very large; note the file size, especially if you do not have a fast internet connection.  File sizes over 100K are listed in red.
  • The entire report is available in one PDF file by clicking this link.  Note that it is very large (4360K) and only appropriate to download if you have a high speed internet connection (T1, cable modem, DSL, etc.)
The Natick High School Modernization Study Report is available in hard copy at the School Department, Morse Institute Library and the Board of Selectmen's Office.  Please contact the Natick Public Schools at (508) 647-6500 for more information.
TABLE OF CONTENTS
Natick High School Modernization Study Report

SECTION PAGES   File Size:  <100K  >100K
    Cover Page   23K
    Executive Summary:  PDF HTML   27K     24K
       
  1 1-4 PROJECT SUMMARY   101K
  2 5 SCHOOL CONSTRUCTION HISTORY   21K
  3   FACILITIES ANALYSIS  
3.1
6   Site Description   36K
3.2
7-10   Existing Building Description   137K
3.3
11-13   Hazardous Materials   44K
3.4
14-19   Plumbing Survey   126K
3.5
20-29   Mechanical Survey   246K
3.6
30-35   Electrical Survey   206K
3.7
36-37   Teacher / Staff Survey   20K
3.8
38   Massachusetts Building Code Review   8K
  4   PUPIL GROWTH STUDY/EDUCATIONAL ANALYSIS  
4.1
39   Enrollment Projections   4K
4.2
40-41   Inventory of Spaces   14K
4.3
42-48   Educational Specifications   10K
4.4
49   School Building Assistance Analysis   23K
  5   ADDITIONS/RENOVATIONS CONSIDERATIONS  
5.1
50   Option Comparison   8K
5.2
51-53   Existing Floor Plans  lower main   upper   372K   546K   265K
5.3
54-59   Option 1 - Study Plans  
        Scheme A  lower main  upper   390K   455K   261K
        Scheme B  lower main  upper   341K   444K   256K
5.4
60-63   Option 1 – Phasing Plans and Schedules   81K
  6   COST ESTIMATES  
6.1
    Option 1 – Renovate Existing High School  
  64-74   Scheme A   29K
  75-85   Scheme B   30K
6.2
86   Option 2 – New High School   4K
  7 87 PRIORITIZED CAPITAL IMPROVEMENT PROJECTS   6K

natickhighschool.net     Natick Public Schools     Town of Natick    natick.info